Bond Work & Sinking Fund Project Update: October 2026

Bond Work & Sinking Fund Project Update: October 2026

With the passing of the August 2023 Bond, and the 2018 Sinking Fund, construction continues as many projects wind down. Because both Bond and Sinking Fund projects are ongoing, these monthly updates will include details on both.

The October update includes construction updates on Angell, The BEAR Complex project, Norup and Anderson Gyms, and Tyler Park. Be sure to read through the whole update and see the photos of the work!   

These monthly Bond & Sinking Fund updates will be maintained on the District’s website. See below for updates on the projects that are taking place in 2026.

Bond & Sinking Fund Projects - Phase I & II Timeline

The following is an estimated timeline. These dates may change due to the nature of construction including weather delays, supply chain delays, etc. 

  • Complete: BHS Pool Construction, Phase I & II
  • Complete: BHS Science Wing Construction
  • Complete: Burton Multi-Purpose Addition and Gym
  • Complete: The Den
  • Complete: Pattengill Multi-Purpose Addition and Gym
  • Complete: Burton Field Renovation
  • Complete: BHS Performing Arts Center (Auditorium, Black Box Theatre, Instrument Commons)
  • Complete: AMS Foods Classroom
  • Complete: AMS Parking Lot Expansion
  • Complete: BHS Courtyard Construction
  • Complete: BHS West Gym
  • Complete: Rogers Multi-Purpose Addition, Gym and Sitework
  • Complete: Hurley Field Phase II
  • Complete: Anderson and Norup Team Rooms & Locker Rooms
  • Nearly Complete: Angell Multi-Purpose Addition, Gym and Sitework
  • Underway: The BEAR Complex
  • Underway: Tyler Park Project

BHS BEAR Complex - Bond

The BEAR Complex (The Berkley Education, Athletics and Recreation Complex) a 60-yard indoor field house that includes a new weight room, team room and trainer room, an outdoor 120-yard turf performance field with lights, parking lot expansion and new configuration and a grass field north of the turf field. 

Construction Update:

  • The outside turf field is installed. The installers are stitching in the final pieces.
  • The outside bleachers are being installed.
  • Installation of the outside signage has begun.  
  • The inside turf prep work is underway.
  • The inside team cages are being installed. These are all around the perimeter between the support beams for teams to store their equipment.
  • Ceiling grid and built-in cabinetry are being installed in the team room.
  • The final finishes were selected for the team room and weight room.
  • HVAC and electrical installation continues.
  • New bushes will be installed along the parking lot fence on Dorothea, replacing the smaller ones that are currently installed. Those plants will be relocated to other areas on The BEAR property or elsewhere in the District.
  • Low-voltage technology is being installed, including cameras, speakers and wireless access points.
  • Interactive flat panels, phones and clocks are on order and will be installed in late December.

Angell Multi-Purpose Addition + Interior Renovations - Bond

Angell’s new multi-purpose/cafeteria addition is attached to the building at the south side, facing the playground. It will house a new lunchroom, a new kitchen, storage rooms, restrooms and will be a wonderful space for collaboration. Angell’s gym also received a makeover, replacing the floor, backboards, padding, as well as painting the ceiling. In addition, the old kitchen area was renovated along with the attached offices.

Angell will host an open house to the public on Thursday, November 12 at 5 pm.

Construction Update:

  • The new basketball hoops in the gym have been installed.
  • Windows have been installed in the new addition.
  • Kitchen equipment has been installed.
  • The kitchen inspections are scheduled for October 30.
  • The sound system was installed in the new addition.
  • Sound baffling has been installed on the new addition ceiling.
  • Lights in the new addition are installed.
  • Ceiling grids are being installed.
  • Handrails are installed in the hallway, which has a downward slope from the main building.
  • Tack boards have been installed in the mulit-purpose addition along with large white boards.
  • Electrical and mechanical work continues.
  • Fixtures are being installed in the new restrooms.
  • Carpet is installed.
  • Final inspection by the State will take place during the week of November 1. It is expected that students will be able to occupy the space on November 9, 2026.

Norup, AMS, BHS, BBB & Hurley Field - Bond

The Norup, AMS, BHS, BBB and Hurley Field project includes updating the school gym floors, paint and equipment at AMS, Norup and BHS as well as renovating the locker rooms and team rooms at Norup and AMS. Hurley Field work includes updating team rooms, restrooms, field lighting, replacing the visitor bleachers, adjusting flow and fence lines, a new scoreboard and expanding the parking lot to improve available spaces as well as traffic flow. In addition, the work includes replacing the gym floor at Berkley Building Blocks, and upgrading the BHS West Gym with air conditioning, lighting and new paint and a renovation of the kitchen space in the AMS Foods Room. The BHS Pool will undergo mechanical work, too.

Norup Gym

  • The new gym wall pads have been installed. The pads on the front of the stage will be installed once they are remanufactured.

AMS Gym

  • The new wall pad installation has begun.

Tyler Park - Sinking Fund

This joint park project combines Berkley Schools and the City of Oak Park properties. On the District side, a new Varsity softball field is being built with lights, permanent fence, dugouts, stands, scoreboard, bullpens and batting cages. The District property will also have a practice softball/baseball field for middle school students. On the City of Oak Park side, a multipurpose field will be updated to improve the drainage issues. A walking path will also be added to both properties to allow for a full path connecting the parking lots to the fields and for the community to enjoy. On the District side of the property a small restroom facility will be built as well.

Construction Update:

  • New dugout structures are nearly complete.
  • The batting cage on the home team side and bullpens for both teams are nearly complete.
  • The sod has been installed in the outfield.
  • Bleachers and press box installation will begin in early November.
  • The competition dirt has been installed in the infield.
  • Utilities are being completed for the new restroom.
  • Asphalt has been installed for the pathway around the park.
  • The fence to enclose the Varsity field is being installed along with the fencing and netting poles for the practice field.
  • The work is expected to wrap up in November. The entire park will remain closed through the winter months to allow the grass and seed to take hold prior to the spring softball season.

Technology

  • The District-wide phone upgrade will begin in December, with planning meetings starting in October.
  • The tech team is busy installing hardware at The BEAR for cameras, wireless access points, and sound systems, and finishing up projects at Angell.
  • New gym sound systems will be scheduled for Norup soon.

Next Projects

  • Pool Phase III will go out to bid this fall to replace the tile in the pool during summer 2027.
  • Weather Tech is completing roofing design work for a portion of BHS, Angell and Pattengill roof repairs. This work is out to bid and will be completed next summer.
  • Renovate The Den heating system.
  • Plans are underway to transform the current weight room and wrestling room at Berkley High School once The BEAR Complex is open.
  • Plans are underway to evaluate cabinetry in all classrooms TK-8 for potential replacement.
  • Plans are underway to evaluate each elevator in the district for safety improvements and upgrades.
  • Purchase new furniture for spaces that are outdated, such as the BHS Collaborative Center and areas inside of the Administrative Offices.